We have now concentrated primarily on 2 projects and we have progressed substantially in this regard. Let me give you the details here.

Primary Healthcare in Tehsil Bagh

We signed an agreement with the govt. of Azad Kashmir, Dept of Health around a month ago to take over four of their Basic Health Units with the objective of

  • Reconstructing the buildings of the clinics that were destroyed during the earthquake
  • Providing doctors
  • Providing medicines free of cost
  • Operating these facilities for a minimum period of 6 months, which can be extendable
  • The lower staff employed by the AJK govt. will work with our staff

    As of this date, we have already reconstructed 2 out of the 4 buildings in a period of less than 4 weeks. These are as follows:
  • Basic Healthcare Building at Rerah, Tehsil Bagh, which is around 1,200 sq.ft with 5 rooms
  • Forward Healthcare Building at Seri Gala, Tehsil Bagh (at an altitude of over 6,000ft), which is around 250 sqft.

    We are now constructing the remaining two buildings as follows:
  • Basic Healthcare Building at Lohar Bela, Tehsil Bagh, which will also be over 1,000 sq.ft
  • Forward Healthcare Building at Samni, Tehsil Bagh, which will be around 250 sqft

    We hope to complete the construction of these 2 buildings within the next 2 weeks insha Allah.

    We have the option to construct a fifth building at Seri, Tehsil Bagh, which is midway between Rerah and Seri Gala. This village is the center for the villages of Kathi and Barikot as well.

    With these 5 units in place, we will be covering primary healthcare facilities for a population of over 30,000.

    The buildings we have constructed are made of sandwich panels (steel sheets on outer and inner surface, with thermopore in between for insulation). The structure is made of angle iron to withstand any earthquake shock. The entire structure is bolted with riveting on the panels.

    We have also poured a PCC (cemented) slab for the floor. In addition, we have done complete electrification of the buildings with proper lighting and electrical heating.

    The buildings have also been furnished with desks, chairs, benches, examination tables, stools, racks, etc.

    We already have most of the basic medical tools required. I shall list out separately what we still need to be able to operate fully.

    At present, we have 3 doctors employed to run the OPD clinics at these facilities. We also have an overall staff of nearly 20 people to manage these health clinics.

    I shall post photographs of these facilities in separate emails for you to see.


    Sarbuland Village

    Our second major project in this area is Sarbuland Village which has been constructed from scratch near Bagh town. This village comprises of the following:
  • 100 homes - that are being allotted on 99 year lease to widows, destitute, disabled, orphans and other poorest segment families in the area.
  • A Montessori school
  • A primary school up to 6th grade
  • A Basic Healthcare Unit
  • A Vocational Training Center for Women
  • Camp for the Village Managers
  • Commercial Center
  • Playgrounds
  • Roads properly planned out
  • Street Lighting
  • Community Baths and Toilets
  • Water Supply System
  • Electrical supply from the main Utility
  • Telephone lines

    Each home comprises of one room made of steel sheets with wood insulation/panelling from inside, and a second room that is a fiberglass container (donated by the Turkish Red Crescent Society). In addition, there will be a small kitchenette with each home.

    The village construction started nearly a month back, and the work is more than 90% complete.

    The Petarian Foundation will be managing the village for the next 5-10 years, providing sanitation services, maintenance of hygiene, operating the healthcare unit, operating the school, supervising other NGOs that will operate the Montessori and Vocational Training Center, roads and building maintenance, operation and maintenance of the electric supply and telephone lines, etc. In other words, the Petarian Foundation will function as the municipal corporation for this village.

    We have already hired the core staff for this project and more people will come on board over the next month or so.

    The village is expected to be inaugurated within the next week or two, and the residents should start moving in very soon thereafter.
 